Chilly work
Published 12:00 am Thursday, December 2, 1999
Steve Easterling, an employee of Doug Conley Construction, tries to keep warm while he screws a piece of sheet metal to the steel frame of the Save-A-Lot being built on Second Street in Ironton this morning.
Thursday, December 02, 1999
Steve Easterling, an employee of Doug Conley Construction, tries to keep warm while he screws a piece of sheet metal to the steel frame of the Save-A-Lot being built on Second Street in Ironton this morning. The store is expected to be completed at the end of the month. Temperatures in the region dropped into the 20s overnight.